| June 13, 2009 | ||
| 8:00 am | to | 12:00 pm |
Upcoming Event:
Mike Driskell has graciously offered to head a Spring Trail Day @ Roadside Crag
Saturday, June 13th, 2009
8:00 am till ???
Meet at the Roadside Lot at 8:00 am (please try to carpool as much as possible).
Dress for outdoor work (with optional afternoon and evening climbing apparel).
Tools needed are shovels, picks, pry bars, spades, rakes, loppers, pruners, and trash bags.
Projects include:
1. Relocate start of main trail closer to the parking lot.
2. Install a sign to display the rules for this area.
3. Install more water bars on trail from parking lot up to the base of Roadside Attraction.
4. Build steps where needed.
5. Redo the cribbing at the base of the slab routes.
6. Remove litter.
7. As many other tasks as we can get done!



4 responses so far ↓
1 ann arbor climber // May 21, 2009 at 8:21 am
would love to help out with this type of work at roadside or any other areas but we have graduation stuff and weddings all of june. please contact me with projects that we could work on solo or for another work day in the fall.
2 Bill Strachan // May 21, 2009 at 11:41 am
Will will be having the Johnny & Alex trail day again in August. We are also looking at having a trail day at Left Flank sometime in the fall. The best way to stay informed of these events is to join the RRGCC’s Facebook page. Otherwise just keep checking back on this site.
3 Matt Pittinger // May 26, 2009 at 10:03 am
I just moved to the Gorge for the summer and would love to help out. See you all on the 13th!
4 Bill Strachan // May 26, 2009 at 1:54 pm
I forgot to mention, if you want to stay informed of event but aren’t on Facebook, just sign up for our mailing list in the upper left hand portion of this website.
Leave a Comment